A useful custom-machine quotation depends on more than the process name. The clearer the part, production and acceptance requirements, the more accurately a supplier can define the machine concept, tooling, controls, cycle time and scope. A quotation based on incomplete information is not a firm price. It is an estimate whose assumptions will change later.
What to send, in priority order
| Priority | Information | Why it matters |
|---|---|---|
| Must have | Part drawings, material, required cycle time, annual volume, project country | Without these, no process or machine concept can be defined |
| Needed for a firm quote | Joint / weld path, quality and leak criteria, automation scope, factory standards | These decide tooling, controls, inspection and validation scope, and therefore price |
| Helpful early | Samples, customer specification, variant list, floor space and layout | These reduce assumptions and shorten quotation time |
1. Part drawings and sample information
Provide 3D data where available, plus critical 2D dimensions, tolerances and the latest revision level. STEP, STP, IGES and native CAD formats are all commonly useful. Photos and physical samples help engineers understand visible surfaces, locating points and handling conditions. State the revision clearly: quoting from an old revision is a common source of later price changes.
2. Material details
Identify the resin grade of every component, including glass or mineral filling, colour, coating and recycled content where applicable. For laser welding, optical transmission and absorber data are especially important. For lamination, include skin, adhesive, foam and substrate specifications.
If the material is not yet confirmed, say so. The supplier can then quote the trial needed to confirm it, rather than assuming a material that may change.
3. Joint and process requirements
Mark the weld path, staking points, assembly sequence or lamination area. If the process is already nominated, provide the customer specification. If not, describe the required result so the supplier can evaluate several processes.
Do not send only a machine name. Two machines with the same process name can differ completely in tooling, stations and controls once the joint and quality requirements are known.
4. Quality and acceptance criteria
Define acceptance before the quotation, not after delivery:
- Required weld strength or pull force
- Leak rate or pressure test requirement
- Allowed weld depth, flash, gap and deformation
- Visible-surface and particle requirements
- Traceability, data storage and inspection records
- FAT sample quantity and acceptance standard
Attach any customer test standard. A weld that passes a pull test may still fail a leak test, and the inspection equipment for the two is different.
5. Cycle time and production volume
State the required total cycle time, annual volume, number of shifts, working days and expected equipment availability. Clarify whether the cycle time includes manual loading, automatic handling, inspection and unloading.
This definition matters. Two suppliers can quote the same machine at different cycle times simply because one counts loading and inspection and the other does not. Put the definition in the RFQ so quotations can be compared fairly.
6. Automation and operator scope
Define which operations are manual, assisted or fully automatic. Include the number of operators, part presentation method, robot or conveyor interfaces, reject handling and changeover expectations.
Automation is not only about speed. It also affects consistency, labour cost, changeover time and maintenance capability. These belong in the business case, not in a decision made after the machine is built.
7. Factory and control standards
Provide the installation country, available voltage and air supply, preferred PLC/HMI brands, communication protocols, plant safety standards, language requirements and floor space. Include customer-specific component and documentation standards in the RFQ. A machine built to one country’s electrical and safety standards cannot simply be shipped to another without changes to the electrical package, documentation and safety devices.
8. Tooling and product variants
List every part variant and the expected changeover frequency. Say whether common tooling is acceptable, whether recipes are required, and whether future products should be considered in the base design.
Tooling is often a major part of the investment. A machine quoted for one variant will cost more, and take longer, if three more variants are added after the order.
Minimum information for an initial evaluation
If the project is still early, start with a drawing, material, required cycle time, annual volume and project country. Jfortune can then recommend a process and identify the data still missing for a firm technical quotation.
What most often delays a quotation
- Drawings without tolerances or revision level
- Material named only as “plastic”, with no grade or filler
- A cycle time with no definition of what it includes
- A leak or strength requirement with no test method
- No installation country or voltage
Sending the five must-have items above avoids most of these delays.
FAQ
Can we get a quotation without a drawing?
An indicative budget is possible from photos, dimensions and a sample, but a firm technical quotation needs a drawing. The supplier will list the assumptions behind any budget figure.
Do we need to send a sample?
For a new material combination or a critical joint, yes. A sample trial is the fastest way to confirm the process can meet the strength and leak requirements.
Will our information be kept confidential?
Yes. Drawings and specifications can be sent under NDA on request. State the NDA requirement with the RFQ so the supplier can arrange it before files are shared.